Projects

Real transformations. Real Starion work.

Our project portfolio is built from genuine before-and-after work completed on site. This first case study shows a full bathroom refurbishment from stripped-back condition to a clean, modern shower room.

Bathroom Refurbishment

From dated bathroom to modern walk-in shower room.

The original bathroom was stripped back and fully refreshed with large-format marble-effect wall tiles, grey floor tiles, a low-profile shower tray with glass screen, modern sanitaryware and a compact vanity unit.

Full refurbishmentWall & floor tilingPlumbingSanitaryware installationShower installation
Before & After

See the transformation.

Drag the divider across the image to compare the original bathroom with the completed refurbishment.

Bathroom before refurbishmentBathroom after refurbishmentBEFOREAFTER
↔
Strip-out & preparationExisting finishes removed and surfaces prepared for refurbishment.
Wall & floor tilingLarge-format marble-effect walls with complementary grey floor finish.
Shower conversionBath replaced with a low-profile shower tray and glass screen.
Fixtures & finishNew vanity, sanitaryware and chrome shower fittings installed.
Before

Starting condition

The bathroom had been stripped back, exposing tired wall surfaces and an older bath, basin, WC and flooring arrangement.

Bathroom before refurbishment view 1
Before
Bathroom before refurbishment view 2
Before
Bathroom before refurbishment view 3
Before
Bathroom before refurbishment view 4
Before
After

Completed refurbishment

The finished space has a brighter, cleaner layout with full-height tiling and a more practical walk-in shower arrangement.

Completed bathroom refurbishment view 1
After
Completed bathroom refurbishment view 2
After
Completed bathroom refurbishment view 3
After
Completed bathroom refurbishment view 4
After
Project 02
Bathroom Refurbishment

Complete rebuild with walk-in shower and brushed brass details.

This bathroom was taken back to the underlying structure and rebuilt with new plumbing arrangements, large-format neutral tiling, a low-profile shower tray, frameless glass screen, modern WC and a dark wall-hung vanity. Brushed brass fittings add a warmer premium finish.

Full strip-out Plumbing alterations Wall & floor tiling Walk-in shower Vanity installation Brushed brass fittings
Before & After

A full transformation from exposed services to finished bathroom.

Drag the divider to compare the stripped room with the completed walk-in shower bathroom.

Bathroom stripped out before refurbishment Completed bathroom refurbishment with walk-in shower BEFORE AFTER
↔
Strip-out & first fixExisting finishes removed to expose the walls, floor and plumbing routes.
Plumbing alterationsServices repositioned and prepared for the new sanitaryware and shower layout.
Tiling & shower baseLarge neutral tiles installed around a clean low-profile shower tray.
Premium finishingGlass screen, dark vanity and brushed brass fittings complete the room.
Preparation & Build

Behind the finished result

These images show the room during the strip-out, plumbing preparation, tiling and shower-tray installation stages.

Bathroom wall opened during refurbishment
Strip-out
Bathroom floor and plumbing exposed during refurbishment
First fix
Bathroom stripped back before tiling
Preparation
Bathroom floor tiling and shower tray in progress
Floor tiling
Bathroom wall tiling in progress
Wall tiling
Bathroom shower tray installation in progress
Shower base
Completed

Finished bathroom

A bright, low-maintenance bathroom with a spacious walk-in shower, clean neutral surfaces and contrasting dark and brass details.

Completed walk-in shower bathroom
After
Completed bathroom with shower and toilet
After
Completed bathroom shower view
After
Completed bathroom vanity and walk-in shower
After
Project 03
Kitchen Refurbishment

Full kitchen transformation with two-tone cabinetry and warm brass details.

This kitchen was stripped back and rebuilt with a more refined, contemporary layout. The finished design combines dark lower and tall units with clean white wall cabinetry, timber open shelving, white worktops, a tiled splashback and brass-tone handles and fittings.

Full kitchen refurbishment Cabinet installation Worktops Wall tiling Lighting Appliance integration Decorating
Before & After

From stripped kitchen to a finished modern space.

Drag the divider to compare the stripped-out kitchen with the completed refurbishment.

Kitchen before refurbishment Completed kitchen refurbishment BEFORE AFTER
↔
Strip-out & preparationExisting kitchen units and finishes removed ready for the new installation.
Cabinetry & storageTwo-tone cabinetry installed with integrated tall units and practical base storage.
Tiling & lightingFresh splashback tiling combined with under-cabinet and ceiling lighting.
Final finishWhite worktops, timber shelves and brass-tone handles bring the design together.
Before

Starting condition

The old kitchen had been largely stripped, leaving exposed wall areas, plumbing and a partial floor finish ready for a complete rebuild.

Kitchen stripped out before refurbishment
Before
Kitchen before installation viewed from doorway
Before
Kitchen stripped wall and flooring before refurbishment
Before
Installation

Kitchen build in progress

Cabinetry, wall units, open shelving, tiled splashbacks and integrated fittings were installed before the worktops and final finishing stages.

Kitchen cabinets and shelving during installation
Installation
Kitchen units and tiling during installation
Installation
Kitchen cabinetry being fitted
Installation
Kitchen tall units and lower units during refurbishment
Installation
Kitchen work in progress with lighting and cabinets
Installation
Completed

Finished kitchen

The completed kitchen combines strong contrast, practical storage and warmer detailing for a clean contemporary result.

Finished kitchen with dark cabinets and white worktops
After
Finished kitchen with open timber shelves
After
Finished kitchen floor and cabinet detail
After
Completed two-tone kitchen refurbishment
After
Living Room Refurbishment

Fresh, elegant living room transformation with restored period character.

The room was carefully prepared and redecorated, with ceiling and wall repairs, crisp white woodwork, a soft sage-green finish and the original fireplace retained as a strong focal point. The result is a bright, clean living space that keeps the character of the property.

Full redecorationCeiling repairsWall preparationWoodwork finishingFinal detailing
Before & After

From preparation to finished room.

Living room during preparation
Before / preparation
Completed living room
After
Preparation & Decorating

Behind the finished result

Living room decorating in progress
Ceiling & wall preparation
Living room wall preparation
Repairs & protection
Completed

Finished living room

Finished living room fireplace view
Fireplace & feature wall
Finished living room bay windows
Bay windows & restored radiators
Finished living room fireplace
Clean period detailing
Finished living room decorated walls
Fresh sage-green finish
Finished living room wall
Decorated room
Finished living room
Final finish
Living Room Refurbishment

From tired flooring to a bright herringbone living space.

This living room and adjoining area were refreshed with the old flooring removed, the base prepared and a new light-oak herringbone floor installed throughout. The finished room combines the new flooring with clean white detailing, patterned wall finishes and a crisp, modern overall appearance.

Floor removalFloor preparationHerringbone flooringFinishing detailsLiving room refurbishment
Before & After

A complete change underfoot.

The original worn floor was stripped out before the new herringbone finish was fitted across the room and adjoining space.

Living room before new flooring
Before — original floor
Living room after herringbone flooring
After — herringbone finish
The Work

Preparation, installation and final finish.

01

Strip out

Existing floor finishes were lifted and removed to expose the base beneath.

02

Preparation

The area was cleared and prepared ready for the replacement floor.

03

Herringbone installation

Light-oak flooring was laid in a herringbone pattern through the main living area.

04

Final detailing

Edges, transitions and finishing details were completed for a clean continuous result.

Project Gallery

From strip-out to completion.

Old flooring being removed
Strip-out
Living room before flooring replacement
Original condition
New herringbone flooring installation
Installation
Finished living room with herringbone flooring
Finished room
Finished herringbone flooring and wall finish
Final detailing
Completed living room refurbishment
Completed project
Planning a refurbishment project?

Talk to Starion about your refurbishment.

Whether you need a complete room refurbishment, flooring, decorating or targeted property works, send us the details and we can discuss the next step.

07351 085728info@starionps.co.ukLondon & Kent
Request a quote